South Pars Gas Field Development, Phases 13, 15, 17-18, 22-24, : Grouting Services for 21 Jackets installation
Client: IOEC/SADRA --- Status: COMPLETED |
Supply, transportation and injection of grouting material into annular space between the piles and pile sleeves to provide the load path for transfer of environmental loads from the structure to seabed and to maintain their integrity of platforms. Grouting operation contains: • Transportation of materials and grouting equipment |