Construction of basin & sea water intake pipeline for Qeshm combined cycle power plant

        Client: MAPNA  ---  Status: Ongoing

Qeshm combined cycle power plant which is under construction, is located on north of Qeshm island and 17 km west of Dargahan city. The power generation capacity of this plant is 500 MW. Also, besides the power plant, the med and RO desalination plants will be built. Seawater once through has been considered for power plant cooling system.

In order to supply the intake water of the main and auxiliary combined cycle power plant cooling system, two units of med desalination plants with a total production capacity of 8,000 cubic meters of fresh water per day and RO desalination plant with a production capacity of 92,000 cubic meters of fresh water per day, a total of 1.2 million cubic meters of seawater per day is required. In order to obtain required water from the sea and discharge the return water into the sea, a proper intake & outfall systems should be constructed.

Delta offshore technology is main contractor for endorsement, construction and installation of the seawater intake/outfall pipelines system.

Read 2044 times