South Pars Gas Field Development, Phases 20-21: Backfilling of Gas Pipelines
Client: IOEC --- Status: COMPLETED |
Transportation and installation of approved backfilling materials around and on top of the two import pipelines after their installation. Each of the 32” sealines will carry 4.5” piggy-back line for transporting lean MEG (mono ethylene glycol) from the onshore facilities to the respective wellhead platform. |