Engineering Vessels for drilling and operation in 1000 m, Procurement, Construction and Commissioning of Semi-submersible Drilling Unit and three multipurpose supporting water.
● Engineering, Procurement, Construction, Installation and Commissioning of offshore Topsides, pipelines and SBM2 for South Pars, Phases 6,7 & 8 in Persian Gulf.
● Engineering, Procurement and construction of Mobin Sea Water Intake Project in Assalluyeh with capacity of 38600 m3/hr with 1000 meter sub bottom sea water intake tunnel and 28 Km pipelines 1.2 to 3.5 meter diameter.
● Engineering, Procurement, construction of Urumieh Lake Bridge. 1800 m. length with 2 x 9 m. highwayand 5 m railway bridge
● Load out, Transportation and installation of 1300 tons Arch Bridge.
● Engineering, Procurement, construction and Commissioning of Float Over and Launch barge FLB 124 with 10.000 tons deck transportation capacity
● Engineering, Procurement, Construction, Installation and Commissioning of offshore Topsides, Jackets, Pipelines, SPM1 and Drilling, perforation and testing of offshore wells for South Pars Gas field Development – Phase 1
● Engineering & Installation operation management of Float over Platforms SPQ1 4000T & SPP1 7000T for South Pars Phase I
● Engineering, Procurement, construction and Commissioning of Pipelaybarge PLB132 pipeline
● Engineering, Procurement, Construction, Installation and Commissioning of See Water intake and related pipeline for Bandar Abbas refinery. Sub Sea Pipeline 80" Diameter 4.5 Kms long for supplying 1 Million m3 of Sea
● 4500 m 42" diameter Pipeline bottom pulling by 600 tons pulling force
● Load out of 2 X 2500 tons platforms for South Pars Gas field Development – Phase 4&5
● Engineering, Procurement, Construction and Installation of Jacket and F9A Oil Platform for Forouzan Field in Persian Gulf
● Yard preparation, Design and Construction of 6 nos. oil platforms fabrication area in Bushehr, Bandar Abbas and Neka
● Design of Ship yard and Offshore yards in Busheher Industrial Island
● Design and Construction of Bushehr Island Shipyard and Neka Shipyard Dry Docks
● Design & Manufacturing of fully automatic controlled Plastic Concrete plant for Karkheh Dam
● Conceptual design of Kalmikea Artificial Island and Port in Russia on Caspian Sea for handling 20 MillionTons of Cargo per year
● Design of 400 Tons Pulling Barge
● Design of Hydraulic Line up with 60 T Capacity for 80” Pipes
● Design Painting Apparatus for coating (internal and outside) of 80" Pipes
Paper issued in International conference
A novel installation methodology for ultra-large diameter sea water intake pipelines
ISOPE2014-TPC-1003