Hormuz Island: Dredging and Shore Protection of Port access Channel Client: PMO --- Status: COMPLETED Dredging of port access channel (172,000 m3). Shore protection of pot access channel (1000 m). Read 5081 times More in this category: « Procurement and installation of steel piles coating (Marine Protect) Urmia lake Bridge South Pars Gas Field Development, Phases 20-21: Backfilling of Gas Pipelines » back to top