Procurement and installation of steel piles coating (Marine Protect) Urmia lake Bridge

        Client: R&T Ministry  ---  Status: COMPLETED

As the seawater level decreased, all steel piles which were designed and constructed submerged, are exposed to splash zone.


Therefore all steel piles have to be corrosion protected by Denso Marine Protection -100 system.

Read 2132 times