South Pars - P.G : Grouting Services for B-GCP and AB-GCP Jackets in P.G & for SPOL and SPD15 Jackets

        Client: SAFF  ---  Status: COMPLETED

Supply, transportation and injection of grouting material into annular space between the piles and pile sleeves to provide the load path for transfer of environmental loads from the structure to seabed and to maintain their integrity of platforms.

Grouting operation contains:

Transportation of materials and grouting equipment

Taking of grout samples for laboratory testing

Measurement the appropriate water/cement ratio.

Mixing of water and cement in two steps

Injection of grout extensively into jackets legs with relevant equipment

Control of applied grout pressure with laboratory tools

Read 8956 times