South Pars - P.G : Grouting Services for B-GCP and AB-GCP Jackets in P.G & for SPOL and SPD15 Jackets
Client: SAFF --- Status: COMPLETED |
Supply, transportation and injection of grouting material into annular space between the piles and pile sleeves to provide the load path for transfer of environmental loads from the structure to seabed and to maintain their integrity of platforms. Grouting operation contains: • Transportation of materials and grouting equipment • Taking of grout samples for laboratory testing • Measurement the appropriate water/cement ratio. • Mixing of water and cement in two steps • Injection of grout extensively into jackets legs with relevant equipment • Control of applied grout pressure with laboratory tools |