P.G Star Refinery : Management, Engineering, Load out and Installation of Marine Pipelines of Seawater Intake System

        Client: PGSOC/SADRA  ---  Status: COMPLETED

SADRA is developing the P.G Star Refinery seawater intake system. The project consists of installation of four 2.7m/length1300m steel pipelines.

Delta Offshore Technology is cooperating with SADRA in executing the installation, engineering and management of the describe pipelines, which includes the following activities:

 

• Quality control procedure of the pipe strings

• Floating pipe strings and relocating from fabrication yard to the installation location

• Connecting strings of pipes together

• Sinking the pipeline and installation at the designated location only in three days