P.G Star Refinery Sea Water Intake

Management, Engineering, Load out and Installation of 4x2.7m/length1300 meters Marine Pipelines of Seawater Intake System

SADRA is developing the P.G Star Refinery seawater intake system. The project consists of installation of four 2.7m/length1300m steel pipelines. Delta Offshore Technology is cooperating with SADRA in executing the installation, engineering and management of the describe pipelines, which includes the following activities:

 

● Quality control procedure of the pipe strings,
● Floating pipe strings and relocating from fabrication yard to the installation location,
● Connecting strings of pipes together,
● Sinking the pipeline and installation at the designated location.